Ultracrete Instant Road Repair 6mm - Part Pallet Offer (26 x 25kg Tubs)
About the product
UltraCrete Instant Road Repair 6MM is renowned as the world’s ‘Number One’ pothole filler. It can be used in any weather and trafficked immediately.
Instant Road Repair is a HAPAS Approved permanent cold lay surfacing tarmac which offers contractors a first-time permanent pothole repair in footways, footpaths and cycle tracks. It saves time, money and means pathways are open to traffic much faster.
Part Pallet Offer – 26 x 25KG Tubs
• 26 x 25kg tubs
• Need more? Buy 39+ tubs at £18.20 + VAT
• Buy 52+ tubs with free delivery
Got a question about IRR 6MM?
Download the technical datasheet (PDF) or see the pothole repair FAQs. Otherwise get in touch and we’ll get back to you by email or phone as soon as we can.
If you find a better price just get in touch — we’ll do our best to price match.
Calculate required quantity
Ultracrete Instant Road Repair 6mm - Part Pallet Offer (26 x 25kg Tubs)
See full delivery info →
For Highlands, Guernsey, Jersey, Isle of Man, and Isle of Wight – call 0330 122 1025.
See full delivery info →
For Highlands, Guernsey, Jersey, Isle of Man, and Isle of Wight – call 0330 122 1025.
How much you will need?
Instant Road Repair 6mm Technical Details:
• Suitable for permanent pothole repairs
• Can be used in all weathers – even in the rain
• Recommended for use with SCJ Seal and Tack spray for a permanent repair
• Depth: 15 – 100mm
• Resealable buckets – so no waste
• Approved for use on the London Underground and Overground
• Satisfactory for use as a PCSM in accordance with Appendix A2.4 of the New Roads and Street Works Act 1991 : Specification for the Reinstatement of Openings in Highways (SROH)
• Size: 25kg plastic bucket (bags available)
• NBS Plus registered for ease of specification
• Shelf Life: 6 months from date of manufacture in sealed units. Once opened, all material should be used up. (DOM usually found on the lid or side of tub or bag. For queries, please contact us).
How do I apply Instant Road Repair 6mm for first time permanent repairs?
- Saw cut a ‘picture frame’ around the repair or reinstatement area.
- Ensure the area is clear of debris.
- Seal vertical edges and substrate with UltraCrete SCJ. Reinstatements requiring up to 60mm in depth can be achieved by using the layer-on-layer method.
- Apply the product to a depth of approximately 45mm and compact to 30mm in order to achieve your first layer.
- Re-apply SCJ Edge Sealant to vertical edges before a second layer of Instant Road Repair 6mm is applied.
- Repeat step 4 to achieve the 60mm depth.
Please note: All compaction should be carried out in accordance with Appendix 8 of the SROH 2010. If over-banding is required, apply UltraCrete Instaband ECO.
About the product
UltraCrete Instant Road Repair 6MM is renowned as the world’s ‘Number One’ pothole filler. It can be used in any weather and trafficked immediately.
Instant Road Repair is a HAPAS Approved permanent cold lay surfacing tarmac which offers contractors a first-time permanent pothole repair in footways, footpaths and cycle tracks. It saves time, money and means pathways are open to traffic much faster.
Part Pallet Offer – 26 x 25KG Tubs
• 26 x 25kg tubs
• Need more? Buy 39+ tubs at £18.20 + VAT
• Buy 52+ tubs with free delivery
Got a question about IRR 6MM?
Download the technical datasheet (PDF) or see the pothole repair FAQs. Otherwise get in touch and we’ll get back to you by email or phone as soon as we can.
If you find a better price just get in touch — we’ll do our best to price match.
UltraCrete Instant Road Repair 6mm — 26 x 25KG Tubs | Part Pallet
UltraCrete Instant Road Repair 6mm is a permanent cold-lay asphalt we genuinely rate for footway, footpath and cycle track reinstatement — HAPAS approved since 2002, instantly trafficable once compacted, and trusted by local authority and civil contractor teams across the UK. This 26-tub deal gives you 650KG of specification-ready material — a practical mid-quantity for contractors who prefer the stackable tub format and don’t need a full pallet right now.
26 x 25KG stackable resealable tubs. HAPAS approved since 2002. PSV 65. Depth range 15–100mm. No mixing or heating required. Instantly trafficable.
We’re a small, family-run business — I’m Cleo, the owner, with over 25 years in the construction industry working with businesses including Tarmac and Instarmac. If you need technical support or want to discuss quantities for a specific project, call us on 0330 122 1025 — we’re always happy to help.
Key Features
- Stackable resealable tub — easy to handle, stack and move around site between jobs
- Ready to use — no mixing or heating required, apply direct from the tub
- Instantly trafficable once compacted — minimal disruption to pedestrians and cyclists
- Suitable for planned and reactive repairs
- Can be used in all weathers including light rain
- Use with SCJ Seal & Tack Spray for a permanent, compliant reinstatement
- Depth range: 15–100mm
- Once opened, all material should be used
- NBS Source-registered for ease of specification
- UltraCrete Accredited Reinstatement Specification (UCARS) product
- HAPAS approved since 2002; PSV 65; SROH 2020 compliant
- London Underground and Overground approved
Why 26 Tubs?
- Practical mid-quantity — covers approx. 26m² at 12–15mm compacted; enough for a solid programme of repairs without committing to a full pallet
- Stackable tub format — rigid containers are easy to move between jobs on a major site or van-based operation
- Shelf life headroom — 6 months from manufacture gives programme flexibility
- Need more? Our 52-tub full pallet deal includes free delivery to England & Wales
About UltraCrete IRR 6mm
UltraCrete Instant Road Repair 6mm is a permanent cold-lay asphalt concrete manufactured with fully graded, high PSV (65) interlocking aggregate and specially formulated bitumen containing polymers and flexibilisers. Designed for permanent first-time reinstatements in footways, footpaths, cycle tracks, car parks and driveways. Used with UltraCrete SCJ Seal & Tack Spray, it forms a specification-compliant permanent repair that is instantly trafficable once compacted.
- HAPAS approved since 2002
- Approved for use on the London Underground and Overground
- SROH Fourth Edition 2020 compliant (PCSM, Appendix A2.4)
- NBS Source-registered; UCARS product
- Manufactured in a BS EN ISO 9001 certified plant
- Min depth 15mm — suitable for shallower repairs not achievable with IRR 10mm (min 30mm)
- IRR is compaction-cured — suitable for light rain; for heavy or persistent rain see UltraCrete Tough Patch
Complete Reinstatement System
- UltraCrete SCJ Seal & Tack Spray — applied to all vertical faces and substrate before and between layers
- UltraCrete IRR 6mm (this product) — the reinstatement material
- UltraCrete Instaband ECO — thermoplastic overbanding applied after compaction where specified
UltraCrete Approved Manhole Reinstatement System
UltraCrete’s PAS and HAPAS approved Ironwork Reinstatement System provides a complete range of high-performance materials for the installation and reinstatement of manholes, access covers and highway ironwork. The system brings together approved bedding mortars, rapid-setting backfill concretes, cold and hot-lay surfacing materials, seal and tack coat and thermoplastic overbanding — providing a complete solution designed for durable, high-performance highway reinstatement. Independently tested and approved through UKAS-accredited laboratories, with products certified by the British Board of Agrément (BBA) and Pavement Testing Services (PTS).
| Product | Role in System |
|---|---|
| M45 | Rapid strength bedding mortar |
| M60 | Rapid strength bedding mortar |
| M60 F | Fibre-reinforced rapid strength bedding mortar |
| M90 | All-purpose fast-set mortar |
| Envirobed CD534 | Cementitious bedding |
| PY4 | Polyester resin bedding system |
| QC10 | Rapid strength backfill concrete |
| QC10 F | Rapid set flowable concrete |
| IRR 6mm (this product) | Cold-lay surfacing asphalt — footways, cycle tracks & car parks |
| IRR 10mm | Cold-lay surfacing asphalt — Type 3 & 4 roads |
| Tough Patch Rapid | High skid resistance cold-lay surfacing |
| SCJ Seal & Tack Coat | Bituminous seal and tack coat spray |
| Enviro Mastic | Hot mastic asphalt surfacing |
| Instaband ECO | Thermoplastic overbanding tape |
Also Available
- IRR 6mm — Single 25KG Tub
- IRR 6mm — 52 x 25KG Tubs (full pallet, free delivery)
- IRR 6mm — Single 25KG Bag
- IRR 6mm — 56 x 25KG Bags (full pallet, free delivery)
- IRR 10mm — Single 25KG Tub
- IRR 10mm — 52 x 25KG Tubs (full pallet)
- IRR Red 6mm — for colour-coded surfaces
UltraCrete Instant Road Repair 6mm FAQs
I’m Cleo, owner of The Paving Experts, with over 25 years in the construction industry working with businesses including Tarmac and Instarmac. I work alongside a small team of incredibly knowledgeable and caring individuals who share the same passion for getting it right. The FAQ answers below come from the questions we’re asked every single day.
What is the difference between the tub and the bag?
Both contain 25kg of the same IRR 6mm material and once opened, all material should be used. The tub is preferred by contractors who need a stackable, rigid container that’s easy to move around site and between jobs. The bag gives better pallet efficiency (56 vs 52 tubs per pallet) and suits larger single repairs or bulk purchasing.
Can I reseal the tub and use it later?
The tub is resealable, but once opened, all material should be used in one go. IRR begins to cure on contact with air, so plan to complete the repair using the full contents of the tub.
Is Instant Road Repair 6mm a permanent repair?
Yes. When applied correctly — including use of UltraCrete SCJ to seal edges and substrate — IRR 6mm provides a first-time permanent reinstatement. HAPAS approved since 2002.
Can I use IRR 6mm on a car park or driveway?
Yes — IRR 6mm is suitable for car parks and driveways as well as footways, footpaths and cycle tracks. For high-stress areas subject to turning or heavy braking, UltraCrete Tough Patch offers greater skid resistance.
How quickly can the area be opened to traffic?
Instantly — once compacted, immediately trafficable. No curing wait required.
Can I use IRR 6mm in the rain?
IRR 6mm is compaction-cured and can be used in light rain. If heavy or persistent rain is forecast, UltraCrete Tough Patch is the better product — it is water-cured and specifically designed for wet conditions.
What is the difference between 6mm and 10mm?
6mm is for footways, footpaths, cycle tracks, car parks and driveways (min depth 15mm). 10mm is for Type 3 and 4 roads (min depth 30mm). If your repair is shallower than 30mm, 6mm is the correct specification.
When should I use Tough Patch instead of IRR 6mm?
UltraCrete Tough Patch is recommended for areas requiring maximum skid resistance, for heavy or persistent rain (it is water-cured), and for surfaces subject to repeated braking or turning loads. Call us on 0330 122 1025 if you’re unsure.
Do I need to use SCJ?
Yes — we strongly recommend using UltraCrete SCJ Seal and Tack Spray on all vertical edges and substrate, and between layers. It creates a waterproof bond and significantly improves repair longevity.
Why is my IRR firm in the tub?
Apply light pressure to the inner bag within the tub to restore normal consistency. In cold weather, store somewhere warm overnight before use.
What is the shelf life?
6 months from date of manufacture in sealed tubs, stored in a cool, well-ventilated place. Once opened, all material should be used.
Is IRR 6mm approved for use on the London Underground?
Yes — approved for use on both the London Underground and Overground.
Need a full pallet instead?
Our 52-tub full pallet deal includes free delivery to England & Wales and is better value per tub for larger programmes. Call us on 0330 122 1025 for bulk pricing.
For technical support, specification help or to place an order, contact our team or call 0330 122 1025 — we’re a small, family-run business and always happy to help.
- Brand: Instarmac
- Product Type: Pothole Repair
- SKU: TPE-IRR6MMX26
- Weight: 650.0 kg / 1433.0 lb
Delivery & Returns Info
Our delivery charges are calculated based on the size and weight of your order. When you add items to your basket, the delivery charges are displayed. Small orders are distributed via courier; larger orders via Pallet Network. Collection is available from our Tamworth depot by request (contact us first to arrange on 0330 122 1025).
Please note, there is a slight surcharge for areas that are outside of our locality, charges calculated at checkout.
| Weight and size | Next Working Day* Order before 1PM (excl. VAT) |
Standard 3-5 Working Day (excl. VAT) |
|---|---|---|
| 0-13KG (1 small bag/tub) |
£14.00 | £9.00 |
| 13.01-25KG (1 large bag/tub) |
£16.00 | £10.00 |
| 25.01-50KG (2 bags/tubs) |
£26.00 | £19.00 |
| 50.01-75KG (3 bags/tubs) |
£36.00 | £28.00 |
| 75.01-100KG (4-5 bags/tubs) |
£46.00 | £37.00 |
| 100.01-249KG (6-9 bags/tubs) |
£60.00 | £45.00 |
| 249.01-750KG (10 bags plus) |
£68.00 | £48.00 |
| 750.01KG plus (30 bags plus) |
£75.00 | £55.00 |
| Full Pallets (56 bags/52 tubs) |
£88.00 | Free of charge |
| Next Working Day delivery (Premium 1-2 Working Day Service) | +avg. £5-10 Extra. Click here for prices |
|---|---|
| Scotland Delivery Service (Deliveries into some parts of Scotland can take 8-10 working days) | Click here for prices |
| Local Delivery & Click & Collect: | Email: orders@thepavingexperts.co.uk |
Delivery Information
- Prices apply to mainland England and Wales. Scottish delivery slight surcharge.
- Orders are packed and dispatched Monday–Friday (excluding weekends & public holidays).
Next Working Day Delivery
- Order before 1PM → same-day dispatch.
- Order after 1PM or on weekends/bank holidays → next working day dispatch.
- You'll receive tracking updates via email/SMS if you provide your details.
Delivery Examples
- Mon before 1PM → Packed Mon, delivered Tue.
- Mon after 1PM → Packed Tues delivered Wed.
- Fri before 1PM → Packed Fri, delivered Mon.
- Fri after 1PM/weekend → Packed Mon, delivered Tues (or Wed after a bank holiday).
- Standard Service: 3–5 working days.
Notes
- Occasional delays due to manufacturing, supply, or courier issues may happen, but we'll keep you informed.
Returns, cancel up to 14 days from date of delivery. Product to be returned in the same condition & packaging. No returns for cementitious & perishable products. You are responsible for the cost of returning goods to The Paving Experts, 20% admin restock fee applies. Need further info, click here.
For further detailed delivery information click here →
For any advice; technical, product, stock or quantity needed, call our team on 0330 122 1025.
Please see our FAQs for more information.
UltraCrete Instant Road Repair 6mm — 26 x 25KG Tubs | Part Pallet
UltraCrete Instant Road Repair 6mm is a permanent cold-lay asphalt we genuinely rate for footway, footpath and cycle track reinstatement — HAPAS approved since 2002, instantly trafficable once compacted, and trusted by local authority and civil contractor teams across the UK. This 26-tub deal gives you 650KG of specification-ready material — a practical mid-quantity for contractors who prefer the stackable tub format and don’t need a full pallet right now.
26 x 25KG stackable resealable tubs. HAPAS approved since 2002. PSV 65. Depth range 15–100mm. No mixing or heating required. Instantly trafficable.
We’re a small, family-run business — I’m Cleo, the owner, with over 25 years in the construction industry working with businesses including Tarmac and Instarmac. If you need technical support or want to discuss quantities for a specific project, call us on 0330 122 1025 — we’re always happy to help.
Key Features
- Stackable resealable tub — easy to handle, stack and move around site between jobs
- Ready to use — no mixing or heating required, apply direct from the tub
- Instantly trafficable once compacted — minimal disruption to pedestrians and cyclists
- Suitable for planned and reactive repairs
- Can be used in all weathers including light rain
- Use with SCJ Seal & Tack Spray for a permanent, compliant reinstatement
- Depth range: 15–100mm
- Once opened, all material should be used
- NBS Source-registered for ease of specification
- UltraCrete Accredited Reinstatement Specification (UCARS) product
- HAPAS approved since 2002; PSV 65; SROH 2020 compliant
- London Underground and Overground approved
Why 26 Tubs?
- Practical mid-quantity — covers approx. 26m² at 12–15mm compacted; enough for a solid programme of repairs without committing to a full pallet
- Stackable tub format — rigid containers are easy to move between jobs on a major site or van-based operation
- Shelf life headroom — 6 months from manufacture gives programme flexibility
- Need more? Our 52-tub full pallet deal includes free delivery to England & Wales
About UltraCrete IRR 6mm
UltraCrete Instant Road Repair 6mm is a permanent cold-lay asphalt concrete manufactured with fully graded, high PSV (65) interlocking aggregate and specially formulated bitumen containing polymers and flexibilisers. Designed for permanent first-time reinstatements in footways, footpaths, cycle tracks, car parks and driveways. Used with UltraCrete SCJ Seal & Tack Spray, it forms a specification-compliant permanent repair that is instantly trafficable once compacted.
- HAPAS approved since 2002
- Approved for use on the London Underground and Overground
- SROH Fourth Edition 2020 compliant (PCSM, Appendix A2.4)
- NBS Source-registered; UCARS product
- Manufactured in a BS EN ISO 9001 certified plant
- Min depth 15mm — suitable for shallower repairs not achievable with IRR 10mm (min 30mm)
- IRR is compaction-cured — suitable for light rain; for heavy or persistent rain see UltraCrete Tough Patch
Complete Reinstatement System
- UltraCrete SCJ Seal & Tack Spray — applied to all vertical faces and substrate before and between layers
- UltraCrete IRR 6mm (this product) — the reinstatement material
- UltraCrete Instaband ECO — thermoplastic overbanding applied after compaction where specified
UltraCrete Approved Manhole Reinstatement System
UltraCrete’s PAS and HAPAS approved Ironwork Reinstatement System provides a complete range of high-performance materials for the installation and reinstatement of manholes, access covers and highway ironwork. The system brings together approved bedding mortars, rapid-setting backfill concretes, cold and hot-lay surfacing materials, seal and tack coat and thermoplastic overbanding — providing a complete solution designed for durable, high-performance highway reinstatement. Independently tested and approved through UKAS-accredited laboratories, with products certified by the British Board of Agrément (BBA) and Pavement Testing Services (PTS).
| Product | Role in System |
|---|---|
| M45 | Rapid strength bedding mortar |
| M60 | Rapid strength bedding mortar |
| M60 F | Fibre-reinforced rapid strength bedding mortar |
| M90 | All-purpose fast-set mortar |
| Envirobed CD534 | Cementitious bedding |
| PY4 | Polyester resin bedding system |
| QC10 | Rapid strength backfill concrete |
| QC10 F | Rapid set flowable concrete |
| IRR 6mm (this product) | Cold-lay surfacing asphalt — footways, cycle tracks & car parks |
| IRR 10mm | Cold-lay surfacing asphalt — Type 3 & 4 roads |
| Tough Patch Rapid | High skid resistance cold-lay surfacing |
| SCJ Seal & Tack Coat | Bituminous seal and tack coat spray |
| Enviro Mastic | Hot mastic asphalt surfacing |
| Instaband ECO | Thermoplastic overbanding tape |
Also Available
- IRR 6mm — Single 25KG Tub
- IRR 6mm — 52 x 25KG Tubs (full pallet, free delivery)
- IRR 6mm — Single 25KG Bag
- IRR 6mm — 56 x 25KG Bags (full pallet, free delivery)
- IRR 10mm — Single 25KG Tub
- IRR 10mm — 52 x 25KG Tubs (full pallet)
- IRR Red 6mm — for colour-coded surfaces
UltraCrete Instant Road Repair 6mm FAQs
I’m Cleo, owner of The Paving Experts, with over 25 years in the construction industry working with businesses including Tarmac and Instarmac. I work alongside a small team of incredibly knowledgeable and caring individuals who share the same passion for getting it right. The FAQ answers below come from the questions we’re asked every single day.
What is the difference between the tub and the bag?
Both contain 25kg of the same IRR 6mm material and once opened, all material should be used. The tub is preferred by contractors who need a stackable, rigid container that’s easy to move around site and between jobs. The bag gives better pallet efficiency (56 vs 52 tubs per pallet) and suits larger single repairs or bulk purchasing.
Can I reseal the tub and use it later?
The tub is resealable, but once opened, all material should be used in one go. IRR begins to cure on contact with air, so plan to complete the repair using the full contents of the tub.
Is Instant Road Repair 6mm a permanent repair?
Yes. When applied correctly — including use of UltraCrete SCJ to seal edges and substrate — IRR 6mm provides a first-time permanent reinstatement. HAPAS approved since 2002.
Can I use IRR 6mm on a car park or driveway?
Yes — IRR 6mm is suitable for car parks and driveways as well as footways, footpaths and cycle tracks. For high-stress areas subject to turning or heavy braking, UltraCrete Tough Patch offers greater skid resistance.
How quickly can the area be opened to traffic?
Instantly — once compacted, immediately trafficable. No curing wait required.
Can I use IRR 6mm in the rain?
IRR 6mm is compaction-cured and can be used in light rain. If heavy or persistent rain is forecast, UltraCrete Tough Patch is the better product — it is water-cured and specifically designed for wet conditions.
What is the difference between 6mm and 10mm?
6mm is for footways, footpaths, cycle tracks, car parks and driveways (min depth 15mm). 10mm is for Type 3 and 4 roads (min depth 30mm). If your repair is shallower than 30mm, 6mm is the correct specification.
When should I use Tough Patch instead of IRR 6mm?
UltraCrete Tough Patch is recommended for areas requiring maximum skid resistance, for heavy or persistent rain (it is water-cured), and for surfaces subject to repeated braking or turning loads. Call us on 0330 122 1025 if you’re unsure.
Do I need to use SCJ?
Yes — we strongly recommend using UltraCrete SCJ Seal and Tack Spray on all vertical edges and substrate, and between layers. It creates a waterproof bond and significantly improves repair longevity.
Why is my IRR firm in the tub?
Apply light pressure to the inner bag within the tub to restore normal consistency. In cold weather, store somewhere warm overnight before use.
What is the shelf life?
6 months from date of manufacture in sealed tubs, stored in a cool, well-ventilated place. Once opened, all material should be used.
Is IRR 6mm approved for use on the London Underground?
Yes — approved for use on both the London Underground and Overground.
Need a full pallet instead?
Our 52-tub full pallet deal includes free delivery to England & Wales and is better value per tub for larger programmes. Call us on 0330 122 1025 for bulk pricing.
For technical support, specification help or to place an order, contact our team or call 0330 122 1025 — we’re a small, family-run business and always happy to help.
Instant Road Repair 6mm Technical Details:
• Suitable for permanent pothole repairs
• Can be used in all weathers – even in the rain
• Recommended for use with SCJ Seal and Tack spray for a permanent repair
• Depth: 15 – 100mm
• Resealable buckets – so no waste
• Approved for use on the London Underground and Overground
• Satisfactory for use as a PCSM in accordance with Appendix A2.4 of the New Roads and Street Works Act 1991 : Specification for the Reinstatement of Openings in Highways (SROH)
• Size: 25kg plastic bucket (bags available)
• NBS Plus registered for ease of specification
• Shelf Life: 6 months from date of manufacture in sealed units. Once opened, all material should be used up. (DOM usually found on the lid or side of tub or bag. For queries, please contact us).
How do I apply Instant Road Repair 6mm for first time permanent repairs?
- Saw cut a ‘picture frame’ around the repair or reinstatement area.
- Ensure the area is clear of debris.
- Seal vertical edges and substrate with UltraCrete SCJ. Reinstatements requiring up to 60mm in depth can be achieved by using the layer-on-layer method.
- Apply the product to a depth of approximately 45mm and compact to 30mm in order to achieve your first layer.
- Re-apply SCJ Edge Sealant to vertical edges before a second layer of Instant Road Repair 6mm is applied.
- Repeat step 4 to achieve the 60mm depth.
Please note: All compaction should be carried out in accordance with Appendix 8 of the SROH 2010. If over-banding is required, apply UltraCrete Instaband ECO.
Delivery & Returns Info
Our delivery charges are calculated based on the size and weight of your order. When you add items to your basket, the delivery charges are displayed. Small orders are distributed via courier; larger orders via Pallet Network. Collection is available from our Tamworth depot by request (contact us first to arrange on 0330 122 1025).
Please note, there is a slight surcharge for areas that are outside of our locality, charges calculated at checkout.
| Weight and size | Next Working Day* Order before 1PM (excl. VAT) |
Standard 3-5 Working Day (excl. VAT) |
|---|---|---|
| 0-13KG (1 small bag/tub) |
£14.00 | £9.00 |
| 13.01-25KG (1 large bag/tub) |
£16.00 | £10.00 |
| 25.01-50KG (2 bags/tubs) |
£26.00 | £19.00 |
| 50.01-75KG (3 bags/tubs) |
£36.00 | £28.00 |
| 75.01-100KG (4-5 bags/tubs) |
£46.00 | £37.00 |
| 100.01-249KG (6-9 bags/tubs) |
£60.00 | £45.00 |
| 249.01-750KG (10 bags plus) |
£68.00 | £48.00 |
| 750.01KG plus (30 bags plus) |
£75.00 | £55.00 |
| Full Pallets (56 bags/52 tubs) |
£88.00 | Free of charge |
| Next Working Day delivery (Premium 1-2 Working Day Service) | +avg. £5-10 Extra. Click here for prices |
|---|---|
| Scotland Delivery Service (Deliveries into some parts of Scotland can take 8-10 working days) | Click here for prices |
| Local Delivery & Click & Collect: | Email: orders@thepavingexperts.co.uk |
Delivery Information
- Prices apply to mainland England and Wales. Scottish delivery slight surcharge.
- Orders are packed and dispatched Monday–Friday (excluding weekends & public holidays).
Next Working Day Delivery
- Order before 1PM → same-day dispatch.
- Order after 1PM or on weekends/bank holidays → next working day dispatch.
- You'll receive tracking updates via email/SMS if you provide your details.
Delivery Examples
- Mon before 1PM → Packed Mon, delivered Tue.
- Mon after 1PM → Packed Tues delivered Wed.
- Fri before 1PM → Packed Fri, delivered Mon.
- Fri after 1PM/weekend → Packed Mon, delivered Tues (or Wed after a bank holiday).
- Standard Service: 3–5 working days.
Notes
- Occasional delays due to manufacturing, supply, or courier issues may happen, but we'll keep you informed.
Returns, cancel up to 14 days from date of delivery. Product to be returned in the same condition & packaging. No returns for cementitious & perishable products. You are responsible for the cost of returning goods to The Paving Experts, 20% admin restock fee applies. Need further info, click here.
For further detailed delivery information click here →
UltraCrete Instant Road Repair 6mm — 26 x 25KG Tubs | Part Pallet
UltraCrete Instant Road Repair 6mm is a permanent cold-lay asphalt we genuinely rate for footway, footpath and cycle track reinstatement — HAPAS approved since 2002, instantly trafficable once compacted, and trusted by local authority and civil contractor teams across the UK. This 26-tub deal gives you 650KG of specification-ready material — a practical mid-quantity for contractors who prefer the stackable tub format and don’t need a full pallet right now.
26 x 25KG stackable resealable tubs. HAPAS approved since 2002. PSV 65. Depth range 15–100mm. No mixing or heating required. Instantly trafficable.
We’re a small, family-run business — I’m Cleo, the owner, with over 25 years in the construction industry working with businesses including Tarmac and Instarmac. If you need technical support or want to discuss quantities for a specific project, call us on 0330 122 1025 — we’re always happy to help.
Key Features
- Stackable resealable tub — easy to handle, stack and move around site between jobs
- Ready to use — no mixing or heating required, apply direct from the tub
- Instantly trafficable once compacted — minimal disruption to pedestrians and cyclists
- Suitable for planned and reactive repairs
- Can be used in all weathers including light rain
- Use with SCJ Seal & Tack Spray for a permanent, compliant reinstatement
- Depth range: 15–100mm
- Once opened, all material should be used
- NBS Source-registered for ease of specification
- UltraCrete Accredited Reinstatement Specification (UCARS) product
- HAPAS approved since 2002; PSV 65; SROH 2020 compliant
- London Underground and Overground approved
Why 26 Tubs?
- Practical mid-quantity — covers approx. 26m² at 12–15mm compacted; enough for a solid programme of repairs without committing to a full pallet
- Stackable tub format — rigid containers are easy to move between jobs on a major site or van-based operation
- Shelf life headroom — 6 months from manufacture gives programme flexibility
- Need more? Our 52-tub full pallet deal includes free delivery to England & Wales
About UltraCrete IRR 6mm
UltraCrete Instant Road Repair 6mm is a permanent cold-lay asphalt concrete manufactured with fully graded, high PSV (65) interlocking aggregate and specially formulated bitumen containing polymers and flexibilisers. Designed for permanent first-time reinstatements in footways, footpaths, cycle tracks, car parks and driveways. Used with UltraCrete SCJ Seal & Tack Spray, it forms a specification-compliant permanent repair that is instantly trafficable once compacted.
- HAPAS approved since 2002
- Approved for use on the London Underground and Overground
- SROH Fourth Edition 2020 compliant (PCSM, Appendix A2.4)
- NBS Source-registered; UCARS product
- Manufactured in a BS EN ISO 9001 certified plant
- Min depth 15mm — suitable for shallower repairs not achievable with IRR 10mm (min 30mm)
- IRR is compaction-cured — suitable for light rain; for heavy or persistent rain see UltraCrete Tough Patch
Complete Reinstatement System
- UltraCrete SCJ Seal & Tack Spray — applied to all vertical faces and substrate before and between layers
- UltraCrete IRR 6mm (this product) — the reinstatement material
- UltraCrete Instaband ECO — thermoplastic overbanding applied after compaction where specified
UltraCrete Approved Manhole Reinstatement System
UltraCrete’s PAS and HAPAS approved Ironwork Reinstatement System provides a complete range of high-performance materials for the installation and reinstatement of manholes, access covers and highway ironwork. The system brings together approved bedding mortars, rapid-setting backfill concretes, cold and hot-lay surfacing materials, seal and tack coat and thermoplastic overbanding — providing a complete solution designed for durable, high-performance highway reinstatement. Independently tested and approved through UKAS-accredited laboratories, with products certified by the British Board of Agrément (BBA) and Pavement Testing Services (PTS).
| Product | Role in System |
|---|---|
| M45 | Rapid strength bedding mortar |
| M60 | Rapid strength bedding mortar |
| M60 F | Fibre-reinforced rapid strength bedding mortar |
| M90 | All-purpose fast-set mortar |
| Envirobed CD534 | Cementitious bedding |
| PY4 | Polyester resin bedding system |
| QC10 | Rapid strength backfill concrete |
| QC10 F | Rapid set flowable concrete |
| IRR 6mm (this product) | Cold-lay surfacing asphalt — footways, cycle tracks & car parks |
| IRR 10mm | Cold-lay surfacing asphalt — Type 3 & 4 roads |
| Tough Patch Rapid | High skid resistance cold-lay surfacing |
| SCJ Seal & Tack Coat | Bituminous seal and tack coat spray |
| Enviro Mastic | Hot mastic asphalt surfacing |
| Instaband ECO | Thermoplastic overbanding tape |
Also Available
- IRR 6mm — Single 25KG Tub
- IRR 6mm — 52 x 25KG Tubs (full pallet, free delivery)
- IRR 6mm — Single 25KG Bag
- IRR 6mm — 56 x 25KG Bags (full pallet, free delivery)
- IRR 10mm — Single 25KG Tub
- IRR 10mm — 52 x 25KG Tubs (full pallet)
- IRR Red 6mm — for colour-coded surfaces
UltraCrete Instant Road Repair 6mm FAQs
I’m Cleo, owner of The Paving Experts, with over 25 years in the construction industry working with businesses including Tarmac and Instarmac. I work alongside a small team of incredibly knowledgeable and caring individuals who share the same passion for getting it right. The FAQ answers below come from the questions we’re asked every single day.
What is the difference between the tub and the bag?
Both contain 25kg of the same IRR 6mm material and once opened, all material should be used. The tub is preferred by contractors who need a stackable, rigid container that’s easy to move around site and between jobs. The bag gives better pallet efficiency (56 vs 52 tubs per pallet) and suits larger single repairs or bulk purchasing.
Can I reseal the tub and use it later?
The tub is resealable, but once opened, all material should be used in one go. IRR begins to cure on contact with air, so plan to complete the repair using the full contents of the tub.
Is Instant Road Repair 6mm a permanent repair?
Yes. When applied correctly — including use of UltraCrete SCJ to seal edges and substrate — IRR 6mm provides a first-time permanent reinstatement. HAPAS approved since 2002.
Can I use IRR 6mm on a car park or driveway?
Yes — IRR 6mm is suitable for car parks and driveways as well as footways, footpaths and cycle tracks. For high-stress areas subject to turning or heavy braking, UltraCrete Tough Patch offers greater skid resistance.
How quickly can the area be opened to traffic?
Instantly — once compacted, immediately trafficable. No curing wait required.
Can I use IRR 6mm in the rain?
IRR 6mm is compaction-cured and can be used in light rain. If heavy or persistent rain is forecast, UltraCrete Tough Patch is the better product — it is water-cured and specifically designed for wet conditions.
What is the difference between 6mm and 10mm?
6mm is for footways, footpaths, cycle tracks, car parks and driveways (min depth 15mm). 10mm is for Type 3 and 4 roads (min depth 30mm). If your repair is shallower than 30mm, 6mm is the correct specification.
When should I use Tough Patch instead of IRR 6mm?
UltraCrete Tough Patch is recommended for areas requiring maximum skid resistance, for heavy or persistent rain (it is water-cured), and for surfaces subject to repeated braking or turning loads. Call us on 0330 122 1025 if you’re unsure.
Do I need to use SCJ?
Yes — we strongly recommend using UltraCrete SCJ Seal and Tack Spray on all vertical edges and substrate, and between layers. It creates a waterproof bond and significantly improves repair longevity.
Why is my IRR firm in the tub?
Apply light pressure to the inner bag within the tub to restore normal consistency. In cold weather, store somewhere warm overnight before use.
What is the shelf life?
6 months from date of manufacture in sealed tubs, stored in a cool, well-ventilated place. Once opened, all material should be used.
Is IRR 6mm approved for use on the London Underground?
Yes — approved for use on both the London Underground and Overground.
Need a full pallet instead?
Our 52-tub full pallet deal includes free delivery to England & Wales and is better value per tub for larger programmes. Call us on 0330 122 1025 for bulk pricing.
For technical support, specification help or to place an order, contact our team or call 0330 122 1025 — we’re a small, family-run business and always happy to help.
Instant Road Repair 6mm Technical Details:
• Suitable for permanent pothole repairs
• Can be used in all weathers – even in the rain
• Recommended for use with SCJ Seal and Tack spray for a permanent repair
• Depth: 15 – 100mm
• Resealable buckets – so no waste
• Approved for use on the London Underground and Overground
• Satisfactory for use as a PCSM in accordance with Appendix A2.4 of the New Roads and Street Works Act 1991 : Specification for the Reinstatement of Openings in Highways (SROH)
• Size: 25kg plastic bucket (bags available)
• NBS Plus registered for ease of specification
• Shelf Life: 6 months from date of manufacture in sealed units. Once opened, all material should be used up. (DOM usually found on the lid or side of tub or bag. For queries, please contact us).
Delivery & Returns Info
Our delivery charges are calculated based on the size and weight of your order. When you add items to your basket, the delivery charges are displayed. Small orders are distributed via courier; larger orders via Pallet Network. Collection is available from our Tamworth depot by request (contact us first to arrange on 0330 122 1025).
Please note, there is a slight surcharge for areas that are outside of our locality, charges calculated at checkout.
| Weight and size | Next Working Day* Order before 1PM (excl. VAT) |
Standard 3-5 Working Day (excl. VAT) |
|---|---|---|
| 0-13KG (1 small bag/tub) |
£14.00 | £9.00 |
| 13.01-25KG (1 large bag/tub) |
£16.00 | £10.00 |
| 25.01-50KG (2 bags/tubs) |
£26.00 | £19.00 |
| 50.01-75KG (3 bags/tubs) |
£36.00 | £28.00 |
| 75.01-100KG (4-5 bags/tubs) |
£46.00 | £37.00 |
| 100.01-249KG (6-9 bags/tubs) |
£60.00 | £45.00 |
| 249.01-750KG (10 bags plus) |
£68.00 | £48.00 |
| 750.01KG plus (30 bags plus) |
£75.00 | £55.00 |
| Full Pallets (56 bags/52 tubs) |
£88.00 | Free of charge |
| Next Working Day delivery (Premium 1-2 Working Day Service) | +avg. £5-10 Extra. Click here for prices |
|---|---|
| Scotland Delivery Service (Deliveries into some parts of Scotland can take 8-10 working days) | Click here for prices |
| Local Delivery & Click & Collect: | Email: orders@thepavingexperts.co.uk |
Delivery Information
- Prices apply to mainland England and Wales. Scottish delivery slight surcharge.
- Orders are packed and dispatched Monday–Friday (excluding weekends & public holidays).
Next Working Day Delivery
- Order before 1PM → same-day dispatch.
- Order after 1PM or on weekends/bank holidays → next working day dispatch.
- You'll receive tracking updates via email/SMS if you provide your details.
Delivery Examples
- Mon before 1PM → Packed Mon, delivered Tue.
- Mon after 1PM → Packed Tues delivered Wed.
- Fri before 1PM → Packed Fri, delivered Mon.
- Fri after 1PM/weekend → Packed Mon, delivered Tues (or Wed after a bank holiday).
- Standard Service: 3–5 working days.
Notes
- Occasional delays due to manufacturing, supply, or courier issues may happen, but we'll keep you informed.
Returns, cancel up to 14 days from date of delivery. Product to be returned in the same condition & packaging. No returns for cementitious & perishable products. You are responsible for the cost of returning goods to The Paving Experts, 20% admin restock fee applies. Need further info, click here.
For further detailed delivery information click here →
How do I apply Instant Road Repair 6mm for first time permanent repairs?
- Saw cut a ‘picture frame’ around the repair or reinstatement area.
- Ensure the area is clear of debris.
- Seal vertical edges and substrate with UltraCrete SCJ. Reinstatements requiring up to 60mm in depth can be achieved by using the layer-on-layer method.
- Apply the product to a depth of approximately 45mm and compact to 30mm in order to achieve your first layer.
- Re-apply SCJ Edge Sealant to vertical edges before a second layer of Instant Road Repair 6mm is applied.
- Repeat step 4 to achieve the 60mm depth.
Please note: All compaction should be carried out in accordance with Appendix 8 of the SROH 2010. If over-banding is required, apply UltraCrete Instaband ECO.






















